This past summer we designed a pressure distribution system for a waterfront property on Horesehead Bay in Gig Harbor. The system was a challenge due to the limited area available for a new septic system between the house, shoreline, and the existing failed drainfield. We were able to design the new system to be installed between the existing tranches of the failed system. The crew at Kat Trax did another excellent job on this install. Design by Larry.